IEA performed a leak audit at refinery that identified over 3600 cfm in air leaks. The repair of the leaks allowed the refinery to turn off (1) 600HP compressor which provided over 3,397,250 Kw Hours saved and $548,936 dollars per year in energy costs
IEA performed a Peak Demand Energy Assessment at a facility which utilized battery backup for peak demand savings. IEA installed an Energy Monitoring System on the main power supplies to the plant and monitored the entire plant demand as well as the battery system. We discovered that the battery system designed to provide 10MW of power during peak demands was only providing 4MW of supply. This discovery allowed the plant to capture 6MW of demand savings and $258,000 in demand charges